Rays Power Infra Solar Project Uttarakhand
Haridwar, Uttarakhand

30 MW Project, Uttarakhand, India

Location Haridwar, Uttarakhand
Project Size 30 MW
Project Start Date October 2016
Commercial Operation Date March  2017
Project Area 87 Acres
Community Benefits Technical training, Mentoring and
Jobs for locals
CO2 Emission Reduced 32850 Tons per Year
Latitude 29°52’43.68
Longitude 77°44’10.81
Free WordPress Themes, Free Android Games